Pre-construction stage
- Setup an appointment with us in our showroom
- Take LOTS of pictures of the room that you would like to remodel. In fact, about five per wall and twenty per room from different angles will give us a good sense of the project.
At our showroom
By coming to our showroom, you've done a tremendous step toward your remodel project. We will now take care the rest of the project for you.
- We partner with Amazing Stone, Inc, to create a one stop showroom that contain cabinets, tiles, counter tops, plumbing, and hardware.
- Upon agreement with material selections, design, and price, a contract will be drafted.
- After the initial deposit, the job will start when the material arrives.
Sample kitchen remodel processUpon material arrival
Day 1: Remove and Dispose of your existing kitchen (and perhaps flooring) Day 2-4: Install new flooring and finish necessary repair work (optional) Day 5: Paint (optional) Day 6: Install cabinetry Day 7-8: Install counter top and backsplash Day 9: Connect plumbing and appliances installation Day 10: Extra |
Sample bathroom remodel processUpon material arrival
Day 1: Remove and Dispose of your existing bathroom Day 2-3: Install tub and waterproof wonder board Day 4-6: Install shower wall and floor tile Day 7: Install cabinet, counter top, and backsplash Day 8: Paint (optional) Day 9: Connect plumbing Day 10: Extra |
Note: Above run downs are for reference only. Depends on project scope, every project has its own schedule.
Tip
- Create a list of "what you want" and "what you need". That will help you focus on your budget.
- Designer's rooms showcase in magazines may be easy on the eyes, but not necessary practical for your lifestyle.